CLIN
  •   
  •   +6(04) 398 1778
Cleanroom Initial plan

Cleanroom Initial plan

The Initial Plan for Factory Construction

• Type of product, product capacity, and design specification
• Calculation of the cleanroom area
• Consideration on airflow, cleanliness, and cleanroom category
• The arrangement for process equipment
• Classification data collection for process equipment's facility requirement(Include water, electricity, gas)
• Moving lines of the process, relocation, shipping, personnel access arrangements
• The location arrangement, safety and convenience consideration for factory system
• Factories funding and milestone planning
• The investigation on the environment special requirement of the product 
• Reserved for future development and expansion
• Environmental Protection Impact Assessment Plan

 Investigation Plan

• Type of product, product quantity, Scope of work, Production process, Future plan
• Land selection, The external environment, Geological drilling (soil, water level), Vibration measurement
• Legislation

Basic Plan

• Construction area
• Process layout
• Environmental requirement
• Main facilities requirement
• Line planning
• Energy saving review
• Project organization chart

Basic Design

• Consideration on factories design
• Finalize on process equipment processes
• Cleanroom requirement conclusive
• Finalized demand on factories facilities
• Automated way confirmation
• Staff organization chart arrangement
• Completion of basic design drawing
• The method to build the building body structure
• Countermeasures and expand for pollution prevention
• Finalized on build material & expand the electrostatic countermeasures

Detail Design

• Completion of the detail design drawing
• Completion of the contract documents
• Project detail review
• Machine relocation planning
• Estimation of cost budget

Construction Supervision

• Confirmation on construction drawing
• Project process management
• Project quality management
• Construction environment management
• Sub-contractor management

Project Check and Acceptance

• Quality audits
• System commissioning, data recording
• System functional test
• As-build drawing and other related information collect and binding
• System manual and manual collect and binding
• Collect and binding test & inspection report
• Make punch list
• Punch list improvement
• Performance acceptance procedures
• Operation training

Hook-Up

• The procedure for machine relocation and setting schedule
• Person-in-charge organization chart for equipment machinery operation
• Equipment machinery support work preparation: procurement, customs, administrative, logistic, and lighting…
• Hook-Up vendor evaluation selection and contract award
• Equipment relocation execution
• Various Hook-up project
• Hook-up project testing and acceptance
• Trial production start

Process machine testing, trial production

• Partial factories system supply
• Security and surveillance system fully enter to the state of alert
• The process equipment start-up functional test
• Process start to operate

 Resources & Articles

CLIN ® "Resources" page is for individuals/companies seeking information on cleanrooms and controlled environments. Find Cleanroom News, Discussion Forums, Cleanroom Cleaning Recommendations, Cleanroom Terminology, Cleanroom Directory, and more.

 Content Disclaimer

Information are contributed by/from different websites and all credit goes to its respective owners/writers/websites/companies and etc, and while we endeavour to keep the information up to date and correct, we make no representations or warranties of any kind, express or implied, about the completeness, accuracy, reliability, suitability or availability with respect to the website or the information, products, services, or related graphics contained on the website for any purpose. Any reliance you place on such information is therefore strictly at your own risk.

In no event will we be liable for any loss or damage including without limitation, indirect or consequential loss or damage, or any loss or damage whatsoever arising from loss of data or profits arising out of, or in connection with, the use of this website.

Through this website you are able to link to other websites which are not under the control of respective owners/writers/websites/companies and etc. We have no control over the nature, content and availability of those sites. The inclusion of any links does not necessarily imply a recommendation or endorse the views expressed within them.

Every effort is made to keep the website up and running smoothly. However, CLIN ® takes no responsibility for, and will not be liable for, the website being temporarily unavailable due to technical issues beyond our control.

We are experienced in Cleanroom Solutions

Call Us for Consultation +6(04) 398 1778

About CLIN

Cleanroom Industries Sdn. Bhd. was founded in 1999 as a pioneer manufacturer in Malaysia specializing in design and manufacture of a full range of cleanroom-related architectural products for cleanroom applications up to Class 1 cleanliness.

Awards & Recognitions

ISO 9001 Malaysia Power Brand Super Excellent Brand Sirim QAS Made in Malaysia Asia Pacific International Honesty Enterprise Keris Award